Asbestos Removal in Inglewood

At Inglewood Asbestos Removal, we make asbestos removal quick and easy for homeowners and property managers alike. Our proven methods include a decade of experience, reliable professionals, guaranteed work, and affordable pricing. Call now for a free, personalized quote, no obligation.

For us, every project is unique and we always focus on your home's needs. Whether you are refreshing one unit or preparing a larger renovation, we begin with the building's use and the desired end result. Flooring, ceiling finishes, insulation and exterior materials all get their own place in our careful planning. Scroll down to learn more about asbestos removal and our unique approach.

One-story pale-yellow stucco house with a gray shingle roof, a small porch with a security door, a chain-link fence and a front yard of agave and lavender
Asbestos testing and surveysPopcorn ceiling removalFloor tile and mastic removalDrywall, joint compound and plaster removalHVAC duct and pipe insulation removalRenovation and demolition abatementApartments and condos

Our asbestos services

Entry hall with a wooden staircase and a textured ceiling, small taped sample squares on the ceiling and wall and sample bags on a stepEmpty living room with a textured popcorn ceiling, beige carpet, curtains and a sliding glass door looking onto trees

Asbestos testing and surveys

Every survey records what was sampled, where, and what the lab found, so a remodel or teardown plan rests on results. A consultant or technician certified by Cal/OSHA takes the samples, and our work plan follows the report.

Popcorn ceiling removal

A lab result is the only way to know whether a textured ceiling contains asbestos, so we test before we plan anything. If it does, we remove the texture from the rooms you choose, from one bedroom to the whole house, and hand the ceiling back for patching and paint.

Garage with painted block walls, a utility sink on the left, worn brown floor covering with a patterned tile patch beside the sink and daylight through the garage doorEmpty room with plastic sheeting on the floor and beside two windows, and a section of wall opened up with broken plaster and exposed framing

Floor tile and mastic removal

Tile, sheet vinyl and the black mastic under them are tested first. We then lift what the lab flags in the rooms you are redoing, from a single bathroom to the whole house.

Drywall, joint compound and plaster removal

Plaster, joint compound and the layers behind a wall surface can only be judged by a lab. We sample the wall or ceiling you plan to open, then remove what tests positive before the remodel begins.

Attic with round foil-wrapped ducts along the rafters, a plank walkway, loose insulation at the sides and light through a small window at the far endEmpty room with clear plastic sheeting over the walls and windows, a bare wood floor and a light blue-gray air machine with a flexible hose

HVAC duct and pipe insulation removal

Wrap, tape and pipe covering around a furnace, a duct run or a water line get a lab test before the system is replaced. We remove the insulation that tests positive so the new equipment can go in.

Renovation and demolition abatement

Whether you are taking out a kitchen wall or tearing the house down, we sort out what has to come out first. We test, remove the materials that test positive and file the required notice before demolition or remodeling starts.

Empty office floor with checkered vinyl floor tile, an air scrubber unit beside a doorway sealed with plastic sheeting and blue tape, and large windows

Apartments and condos

Condos, townhouses and apartment buildings do not get the single-home exceptions, so testing, the notice and removal by a licensed contractor all apply. We plan the work around the building’s units and shared spaces.

Asbestos testing and removal costs

Nearly 8 in every 10 Inglewood homes were built before 1980, making asbestos a common issue in our community. Our price ranges cover hired labor, materials, containment, lab fees and disposal for typical jobs in Inglewood, Culver City and West Hollywood. Expect the low figure for a small job with easy access, and the top for bigger areas, occupied buildings, second stories or extra air tests.

Asbestos testing and surveys

  • Testing for a small remodel, a few samples$400 – $800+
  • Whole-house survey before a remodel or demolition$600 – $1,500+
  • Air test after removal (clearance)$400 – $1,000+
What is included

A Cal/OSHA-certified consultant or technician takes the samples, a lab reads each one and a written report follows. The air test after removal is booked with an independent consultant and has its own line.

Get a free quoteSee an example project

Popcorn ceiling removal

  • One room, about 150–250 sq ft of ceiling$1,500 – $4,000+
  • Several rooms, about 600–1,000 sq ft of ceiling$4,000 – $9,000+
  • Whole house, about 1,200–2,000 sq ft of ceiling$7,500 – $17,000+
What is included

Plastic over the rooms and air filters running, the ceiling wetted and scraped, bagged disposal and a final cleanup. Patching, new texture and paint come separately.

Get a free quoteSee an example project

Floor tile and mastic removal

  • One bathroom or laundry floor, up to about 100 sq ft$1,200 – $3,000+
  • Kitchen floor, about 200–300 sq ft$2,000 – $5,000+
  • Several rooms of flooring, about 1,000 sq ft$5,000 – $12,000+
What is included

The area sealed, tile or sheet vinyl lifted, the black glue under it removed where it tested positive, then bagged disposal and a cleanup. A new floor is not included.

Get a free quoteSee an example project

Drywall, joint compound and plaster removal

  • One wall or a new doorway, up to about 100 sq ft$1,200 – $3,000+
  • One room of walls, about 350–450 sq ft$3,000 – $7,000+
  • Whole-house walls and ceilings, about 1,500 sq ft home$15,000 – $40,000+
What is included

Plastic containment with air filters, the wall or ceiling material that tested positive taken out wet, bagged disposal and a cleanup. New drywall and paint are not included.

Get a free quoteSee an example project

HVAC duct and pipe insulation removal

  • Duct wrap at the furnace or a few duct joints$1,200 – $3,000+
  • All attic ducts in a house, removal only (new ducts extra)$2,500 – $6,500+
  • Pipe or boiler insulation, up to about 50 ft$1,000 – $2,500+
What is included

A sealed work area in the attic, furnace closet or boiler room, the wrap, tape or insulation that tested positive removed and bagged, and a cleanup. New ducts or insulation are a separate price.

Get a free quoteSee an example project

Renovation and demolition abatement

  • Kitchen or bathroom remodel, one or two materials$2,000 – $5,500+
  • Whole-house remodel or teardown, several materials$15,000 – $40,000+
What is included

Positive materials come out before the remodel or demolition crew starts, with containment, bagged disposal and a cleanup. The survey and the district notification fee are billed on top.

Get a free quoteSee an example project

Apartments, condos and commercial suites

  • Survey of a commercial suite or small building$2,000 – $5,000+
  • One apartment or condo unit, ceilings and floors$4,500 – $11,000+
  • One office or shop suite, about 1,000–1,500 sq ft$7,500 – $20,000+
What is included

Removal in a sealed unit, suite or common area, disposal records and a cleanup, planned around residents. The survey and the district notification fee are billed on top.

Get a free quoteSee an example project

Stucco removal

  • Stucco around one window or door$1,200 – $3,000+
  • Stucco on one wall or an addition, about 200–400 sq ft$3,000 – $8,000+
  • Stucco on a whole house, about 1,500–2,000 sq ft of wall$15,000 – $40,000+
What is included

Plastic around the work area, stucco that tested positive cut out wet, bagged disposal and a cleanup. New lath, stucco or siding is not included.

Get a free quote

Cement siding removal

  • Cement siding on one wall or a garage, about 200–400 sq ft$2,000 – $5,000+
  • Cement siding on a whole house, about 1,500–2,000 sq ft$11,000 – $24,000+
What is included

Whole pieces removed by hand while wet, wrapped and sealed, then hauled with a cleanup of the grounds. New siding is extra.

Get a free quote

Ranges are 2026 estimates, not quotes. Call today for a free, personalized quote.

Where Inglewood sends asbestos questions

Inglewood posts the South Coast Air Quality Management District’s demolition notification form for homeowners, and the city’s own FAQ answers asbestos questions by pointing to the district’s Asbestos Hot Line at (909) 396-2336. If you want to confirm a rule for your address, that is the number to call.

The form says in capitals that an asbestos survey is required before any demolition. That is the district’s statement, not an Inglewood rule, and the district’s rule reaches further, calling for the survey prior to any demolition or renovation. Small jobs in a single-unit house have a carve-out that the asbestos testing and surveys page explains.

We file the district notice online through the district’s Rule 1403 Notification Web Application, as contractors do. The paper form Inglewood posts is the owner-resident version, for a demolition notice. The timing does not change, no later than 10 working days before the work, with a district notification fee.

Homes built before 1960

Inglewood leans old. Over 3 in 10 of its homes predate 1950, the median home was built in or before 1960, and more than 4 in 10 homes are one-unit.

An older house can carry flooring from several remodels, with newer tile or sheet vinyl laid over older layers. A survey looks through those layers instead of stopping at the top one, and the same goes for ceilings and the cavities inside walls.

Small apartment buildings

Buildings of five or more units hold more than 4 in every 10 Inglewood homes, and more than 6 in every 10 households rent, so multi-unit buildings are a real share of local housing.

A residential single unit dwelling is one home. Apartments, townhouses and condominiums are not, so a unit owner cannot use the owner-occupant provision or the small-job survey exception. See apartments and condos for how we plan these jobs.

Ceiling texture and what the lab finds

Each ceiling sample comes back from the lab with a percentage per material, and one number can mean different things. A result above 1/10th of 1% asbestos by weight is material to Cal/OSHA. For South Coast AQMD and California’s hazardous waste table, the line is higher, at 1 percent.

A result between those two lines is still asbestos-containing material to Cal/OSHA, so we read every number against both lines when we plan the work. If the lab confirms asbestos in your texture, our popcorn ceiling removal page shows how a ceiling job runs.

Our process

01

Samples and a site visit

We visit the house, point out what needs testing and arrange sampling by a Cal/OSHA-certified consultant or technician. The lab report sets what has to be removed before your project goes ahead.

02

Notice and scheduling

We file the district notice online and schedule the work around the notice period, so the start date follows the paperwork rather than the other way around.

03

Removal, air test and waste

The crew removes the material, and an independent consultant tests the air afterward. Friable asbestos waste leaves with a licensed hauler under a manifest.

Serving Inglewood, Culver City and West Hollywood

We also serve Culver City and West Hollywood. Call us for confirmation if your address is outside the area.

Frequently asked questions

Can I remove asbestos from my own house?

The district advises home-owners against removing asbestos themselves, because of the potential for exposure and cross contamination, so please leave the removal to a licensed contractor and do not take samples yourself. The owner-occupant provision covers an owner-occupant of a residential single-unit dwelling who personally carries out the renovation there. That means a house lived in by its owner, not empty, rented out or run as a business, with the owner doing the work and no laborers, friends or family helping. Any waste carried out of the house is still governed by the rule, and demolition and condos are excluded.

Who is allowed to remove asbestos from a house?

A contractor with the right credentials. Under California law, a contractor may not do asbestos-related work involving 100 square feet or more of asbestos-containing material unless it holds the C-22 Asbestos Abatement classification or its qualifier passed the asbestos certification exam. Before anyone opens a ceiling, ask two questions. What is your license number? Does it carry C-22 or ASB? You can look the license up with the Contractors State License Board.

Does a small job need Cal/OSHA registration?

Registration applies to work involving 100 square feet or more of asbestos-containing material, and the employer must obtain it before the work begins. Smaller jobs are not subject to registration, but the employer still files a Report of Use with Cal/OSHA. Registration belongs to the employer whose crew does the work, so ask each contractor you compare for theirs.

What changes the price of an asbestos job?

Size and access move the price. Extra air tests, a second story and occupied rooms add to it, and so does the district notification fee, which is sized by the job. We give a free, personalized quote once we know what the lab found.

How does the waste leave my house?

Waste handling stays with the crew, not with you. Friable asbestos waste is hazardous waste in California and travels with a licensed hauler and a manifest. The table’s 1 percent limit reaches only material that is friable, powdered or finely divided, so nonfriable material sits outside that table, though other agencies may still restrict it. Rule 1403 covers the waste either way, and the district’s Asbestos Hot Line can answer questions about leftover material.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (424) 414-6846

Call (424) 414-6846